TELECOM · TIMELINE

Timeline

How Syria's telecom sector got here, from the first mobile licences to the rebuild now under contract.

Telecom Index 4 sourced indicators of 15

The two earlier eras are deliberately sparse. Umran records what it can source, and the documentary record for Syrian telecom before December 2024 is thin — padding it with dates taken from secondary summaries would make this page look more complete and be less reliable. Several entries carry a placeholder day within a known month; each says so in its own note.

8 December 2024 is the baseline every Umran figure is measured from. Nothing before it is credited as recovery.

Before 2011

  1. Syriatel founded

    One of Syria's two mobile operators is founded.

    Trade press Reported

  2. MTN Syria founded as Areeba

    The second operator enters the market as Areeba, later becoming MTN Syria.

    Trade press Reported

War years, 2011–2024

  1. MTN Group sells its remaining stake in MTN Syria

    The 75% stake passes to TeleInvest, part of Dallah Al-Baraka, ending the South African group's presence in the Syrian market.

    Trade press Reported

  2. Political transition — the index baseline

    The date every Umran figure is measured from. No progress in the sector is credited to anything before it.

    Umran — Recovery Index baseline Sourced

After December 2024

  1. Abdulsalam Haykal appointed Minister of Communications and Information Technology

    He succeeds Hussein al-Masri, who had held the ministry since 10 December 2024.

    Ministry of Communications and Information Technology Sourced

  2. Ministry launches the SilkLink project

    The project goes to tender, drawing stc, Zain, Etisalat and Ooredoo.

    Ministry of Communications and Information Technology Sourced

  3. Ministry launches Barq Net

    A nationwide fibre-to-the-premises project on a public–private partnership and an open-access model separating infrastructure from services. The two-year clock on connecting 85% of homes and institutions runs from this date.

    SANA — Ministry of Communications and Information Technology statement Sourced

  4. Barq Net request for information closes

    The RFI covers all 14 governorates on a VULA-based wholesale model.

    Ministry of Communications and Information Technology — Barq Net portal Sourced

  5. 5G pilot begins in Damascus

    The minister announces 5G entering pilot stage, with later expansion "gradually and carefully" and no date attached.

    +963 Media, reporting the minister at AI-Syria 2025 Reported

  6. Minister sets out the split: SilkLink the backbone, Barq Net the last mile

    The minister says SilkLink phase one completes within six to eight months, and that FTTH and fixed wireless access are under test in Damascus.

    SANA Sourced

  7. SilkLink implementation agreement signed with stc Group

    A joint venture 75% stc Group and 25% Syrian Sovereign Fund, to build more than 4,500 km of fibre and a submarine cable landing station at Tartus.

    Saudi Press Agency Sourced

  8. Five Saudi–Syrian agreements worth more than USD 5.3bn, SilkLink among them

    SilkLink was signed inside a package spanning aviation, telecoms, infrastructure and water desalination. This is the frame the sector's financing sits in: telecom is a line in a larger package, not a standalone deal.

    Saudi Press Agency Sourced

  9. International tender launched to replace the MTN licence

    Announced at MWC Barcelona, with completion scheduled for 15 June 2026.

    SANA Sourced

  10. Zain awarded the national mobile licence

    A 20-year renewable licence for USD 747m, with investment of more than USD 800m over ten years and a six-month transition preserving service for 6.3 million subscribers.

    Zain Group press release Sourced

  11. Regulator: Zain to launch within six months

    Regulator director general Khaled al-Homsi sets out the licence terms and the transition window.

    SANA, quoting Syrian Telecommunications and Post Regulatory Authority director general Khaled al-Homsi Sourced

Sources on this page

  1. Trade press Reported · 30 June 2026 · Last updated 11 August 2026
  2. Zain Group press release Official · 30 June 2026 · Last updated 11 August 2026
  3. SANA Official · 3 March 2026 · Last updated 11 August 2026
  4. Saudi Press Agency Official · 7 February 2026 · Last updated 11 August 2026
  5. SANA Official · 21 November 2025 · Last updated 11 August 2026
  6. +963 Media, reporting the minister at AI-Syria 2025 Reported · 1 September 2025 · Last updated 11 August 2026
  7. Ministry of Communications and Information Technology — Barq Net portal Official · 15 July 2025 · Last updated 11 August 2026
  8. SANA — Ministry of Communications and Information Technology statement Official · 15 June 2025 · Last updated 11 August 2026
  9. Ministry of Communications and Information Technology Official · 29 March 2025 · Last updated 11 August 2026
  10. Umran — Recovery Index baseline Official · 8 December 2024 · Last updated 11 August 2026